A man can do a piece of work in 12 days. If he works for 4 days, what fraction o

₹0.0
Login to Download
  • 📥 Instant PDF Download
  • ♾ Lifetime Access
  • 🛡 Secure & Original Content

What’s inside this PDF?

Question: A man can do a piece of work in 12 days. If he works for 4 days, what fraction of the work is left?

Options:

  1. 1/3
  2. 1/4
  3. 1/2
  4. 2/3

Correct Answer: 2/3

Solution:

Work done in 4 days = 4/12 = 1/3. Work left = 1 - 1/3 = 2/3.

A man can do a piece of work in 12 days. If he works for 4 days, what fraction o

Practice Questions

Q1
A man can do a piece of work in 12 days. If he works for 4 days, what fraction of the work is left?
  1. 1/3
  2. 1/4
  3. 1/2
  4. 2/3

Questions & Step-by-Step Solutions

A man can do a piece of work in 12 days. If he works for 4 days, what fraction of the work is left?
  • Step 1: Understand that the man can complete the entire work in 12 days.
  • Step 2: Calculate how much work he does in one day. This is 1 work unit divided by 12 days, which equals 1/12 of the work per day.
  • Step 3: Determine how much work he does in 4 days. Multiply the work done in one day (1/12) by 4 days: (1/12) * 4 = 4/12.
  • Step 4: Simplify 4/12 to 1/3. This means he has completed 1/3 of the work in 4 days.
  • Step 5: Calculate the remaining work. Since he has completed 1/3 of the work, the remaining work is 1 - 1/3.
  • Step 6: To find 1 - 1/3, convert 1 to a fraction with a denominator of 3: 1 = 3/3. Now subtract: 3/3 - 1/3 = 2/3.
  • Step 7: Conclude that the fraction of the work left is 2/3.
  • Work and Time – Understanding how to calculate work done over a period of time based on a given rate.
  • Fraction Calculation – Ability to compute fractions and understand their implications in the context of work completion.