A man can complete a work in 15 days. If he works for 3 days, how much work is l

₹0.0
Login to Download
  • 📥 Instant PDF Download
  • ♾ Lifetime Access
  • 🛡 Secure & Original Content

What’s inside this PDF?

Question: A man can complete a work in 15 days. If he works for 3 days, how much work is left?

Options:

  1. 1/5
  2. 1/4
  3. 1/3
  4. 1/2

Correct Answer: 1/3

Solution:

Work done in 3 days = 3/15 = 1/5. Work left = 1 - 1/5 = 4/5.

A man can complete a work in 15 days. If he works for 3 days, how much work is l

Practice Questions

Q1
A man can complete a work in 15 days. If he works for 3 days, how much work is left?
  1. 1/5
  2. 1/4
  3. 1/3
  4. 1/2

Questions & Step-by-Step Solutions

A man can complete a work in 15 days. If he works for 3 days, how much work is left?
  • Step 1: Understand that the man can complete the entire work in 15 days.
  • Step 2: Calculate how much work he does in one day. This is 1 work unit divided by 15 days, which equals 1/15 of the work per day.
  • Step 3: Determine how much work he completes in 3 days. Multiply the work done in one day (1/15) by 3 days: (1/15) * 3 = 3/15.
  • Step 4: Simplify 3/15 to 1/5. This means he has completed 1/5 of the work in 3 days.
  • Step 5: Calculate the remaining work. Subtract the work done (1/5) from the total work (1): 1 - 1/5 = 4/5.
  • Step 6: Conclude that 4/5 of the work is left to be completed.
  • Work Rate – Understanding how to calculate work done based on time and total work capacity.
  • Fractional Work – Using fractions to represent portions of work completed and remaining.