?
Categories
Account

A man can complete a work in 20 days. If he works for 5 days, what fraction of t

₹0.0
Login to Download
  • 📥 Instant PDF Download
  • ♾ Lifetime Access
  • 🛡 Secure & Original Content

What’s inside this PDF?

Question: A man can complete a work in 20 days. If he works for 5 days, what fraction of the work is left?

Options:

  1. 1/4
  2. 3/4
  3. 1/5
  4. 2/5

Correct Answer: 3/4

Solution:

In 5 days, he completes 5/20 = 1/4 of the work. Therefore, the remaining work is 1 - 1/4 = 3/4.

A man can complete a work in 20 days. If he works for 5 days, what fraction of t

Practice Questions

Q1
A man can complete a work in 20 days. If he works for 5 days, what fraction of the work is left?
  1. 1/4
  2. 3/4
  3. 1/5
  4. 2/5

Questions & Step-by-Step Solutions

A man can complete a work in 20 days. If he works for 5 days, what fraction of the work is left?
  • Step 1: Understand that the man can complete the entire work in 20 days.
  • Step 2: Calculate how much work he completes in 1 day. This is 1/20 of the work.
  • Step 3: Determine how much work he completes in 5 days. This is 5 days * (1/20 of the work per day) = 5/20 of the work.
  • Step 4: Simplify 5/20 to find out how much of the work he has completed. 5/20 simplifies to 1/4.
  • Step 5: Calculate the remaining work. Since he completed 1/4 of the work, the remaining work is 1 - 1/4.
  • Step 6: Simplify 1 - 1/4 to find the fraction of work left. This equals 3/4.
  • Work Rate – Understanding how to calculate the fraction of work completed based on the total time and the time spent working.
  • Fraction Calculation – Ability to perform basic arithmetic operations with fractions to determine the remaining work.
Soulshift Feedback ×

On a scale of 0–10, how likely are you to recommend The Soulshift Academy?

Not likely Very likely
Home Practice Performance eBooks