?
Categories
Account

A man can do a piece of work in 12 days. If he works for 4 days, what part of th

₹0.0
Login to Download
  • 📥 Instant PDF Download
  • ♾ Lifetime Access
  • 🛡 Secure & Original Content

What’s inside this PDF?

Question: A man can do a piece of work in 12 days. If he works for 4 days, what part of the work is left?

Options:

  1. 1/3
  2. 1/4
  3. 2/3
  4. 1/2

Correct Answer: 2/3

Solution:

In 4 days, he completes 4/12 = 1/3 of the work. Therefore, work left = 1 - 1/3 = 2/3.

A man can do a piece of work in 12 days. If he works for 4 days, what part of th

Practice Questions

Q1
A man can do a piece of work in 12 days. If he works for 4 days, what part of the work is left?
  1. 1/3
  2. 1/4
  3. 2/3
  4. 1/2

Questions & Step-by-Step Solutions

A man can do a piece of work in 12 days. If he works for 4 days, what part of the work is left?
  • Step 1: Understand that the man can complete the entire work in 12 days.
  • Step 2: Calculate how much work he does in one day. This is 1 work unit divided by 12 days, which equals 1/12 of the work per day.
  • Step 3: Determine how much work he completes in 4 days. Multiply the work done in one day (1/12) by 4 days: (1/12) * 4 = 4/12.
  • Step 4: Simplify 4/12 to find out how much work he has completed. 4/12 simplifies to 1/3 of the work.
  • Step 5: Calculate the remaining work. Since he completed 1/3 of the work, subtract this from the total work (1): 1 - 1/3 = 2/3.
  • Step 6: Conclude that the part of the work left is 2/3.
  • Work Rate – Understanding how to calculate the portion of work completed based on the total time taken to complete the work.
  • Fraction Subtraction – Applying basic fraction operations to determine the remaining work after a portion has been completed.
Soulshift Feedback ×

On a scale of 0–10, how likely are you to recommend The Soulshift Academy?

Not likely Very likely
Home Practice Performance eBooks