In a scheduling puzzle, if A finishes before B and C starts after B, who can be

₹0.0
Login to Download
  • 📥 Instant PDF Download
  • ♾ Lifetime Access
  • 🛡 Secure & Original Content

What’s inside this PDF?

Question: In a scheduling puzzle, if A finishes before B and C starts after B, who can be scheduled last? (2021)

Options:

  1. A
  2. B
  3. C
  4. None of the above

Correct Answer: C

Exam Year: 2021

Solution:

C can be scheduled last as C starts after B finishes.

In a scheduling puzzle, if A finishes before B and C starts after B, who can be

Practice Questions

Q1
In a scheduling puzzle, if A finishes before B and C starts after B, who can be scheduled last? (2021)
  1. A
  2. B
  3. C
  4. None of the above

Questions & Step-by-Step Solutions

In a scheduling puzzle, if A finishes before B and C starts after B, who can be scheduled last? (2021)
  • Step 1: Identify the order of events. A finishes before B, which means A must be done before B starts.
  • Step 2: Note that C starts after B. This means C cannot start until B has finished.
  • Step 3: Since C starts after B, it can only begin after B is done.
  • Step 4: Therefore, C can be scheduled last because it is the last event that can start after B finishes.
  • Scheduling Order – Understanding the sequence of events and dependencies in scheduling tasks.
  • Logical Reasoning – Applying logical deductions based on given conditions to determine possible outcomes.
Soulshift Feedback ×