Which of the following is NOT a component of a standard cost system?

  • 📥 Instant PDF Download
  • ♾ Lifetime Access
  • 🛡 Secure & Original Content

What’s inside this PDF?

Question: Which of the following is NOT a component of a standard cost system?

Options:

  1. Direct materials standard
  2. Direct labor standard
  3. Variable overhead standard
  4. Actual cost incurred

Correct Answer: Actual cost incurred

Solution:

Actual cost incurred is not a component; standard costs are predetermined.

Which of the following is NOT a component of a standard cost system?

Practice Questions

Q1
Which of the following is NOT a component of a standard cost system?
  1. Direct materials standard
  2. Direct labor standard
  3. Variable overhead standard
  4. Actual cost incurred

Questions & Step-by-Step Solutions

Which of the following is NOT a component of a standard cost system?
  • Step 1: Understand what a standard cost system is. It is a method used by companies to estimate the expected costs of production.
  • Step 2: Identify the components of a standard cost system. These typically include standard costs for materials, labor, and overhead.
  • Step 3: Recognize that actual costs are the real expenses incurred during production, which can differ from standard costs.
  • Step 4: Determine which option does not belong to the standard cost system. Since actual costs are not predetermined, they are not a component of a standard cost system.