Q. In a potentiometer, if the wire has a uniform cross-section, how does it affect the potential gradient?
  • A. It becomes non-uniform
  • B. It remains uniform
  • C. It increases
  • D. It decreases
Q. In a potentiometer, if the wire is made of a material with higher resistivity, what effect does it have on the potential gradient?
  • A. It increases the potential gradient.
  • B. It decreases the potential gradient.
  • C. It has no effect.
  • D. It makes the potentiometer unusable.
Q. In a potentiometer, what is the role of the jockey?
  • A. To measure current.
  • B. To connect the circuit.
  • C. To find the balance point.
  • D. To provide a reference voltage.
Q. In a practical Wheatstone bridge, what is the effect of temperature on resistance measurements?
  • A. Temperature has no effect
  • B. Resistance increases with temperature
  • C. Resistance decreases with temperature
  • D. It depends on the material
Q. In a practical Wheatstone bridge, what is the effect of temperature on the resistors?
  • A. It has no effect
  • B. It can change resistance values
  • C. It only affects the galvanometer
  • D. It only affects the power supply
Q. In a practical Wheatstone bridge, what is the effect of temperature on the resistances?
  • A. Resistances remain constant
  • B. Resistances increase with temperature
  • C. Resistances decrease with temperature
  • D. Temperature has no effect
Q. In a practical Wheatstone bridge, what is the main source of error?
  • A. Temperature variations
  • B. Resistance of the connecting wires
  • C. Calibration of the galvanometer
  • D. Non-ideal resistors
Q. In a predator-prey relationship, what is the primary effect of an increase in the prey population? (2021)
  • A. Decrease in predator population
  • B. Increase in predator population
  • C. Decrease in prey population
  • D. No effect on predator population
Q. In a predator-prey relationship, which of the following is true? (2022)
  • A. Predators are always larger than their prey.
  • B. Prey populations are always larger than predator populations.
  • C. Predators help control prey populations.
  • D. Prey can never escape predators.
Q. In a prism, if the angle of incidence is equal to the angle of emergence, what can be said about the angle of deviation?
  • A. It is zero
  • B. It is equal to the angle of incidence
  • C. It is equal to the angle of emergence
  • D. It is equal to the angle of the prism
Q. In a prism, if the angle of the prism is 60 degrees, what is the minimum angle of deviation for light passing through it?
  • A. 30 degrees
  • B. 60 degrees
  • C. 90 degrees
  • D. 45 degrees
Q. In a process where 100 J of heat is added to a system and the internal energy increases by 40 J, how much work is done by the system?
  • A. 60 J
  • B. 40 J
  • C. 100 J
  • D. 140 J
Q. In a process where 300 J of heat is added to a system and the internal energy increases by 100 J, how much work is done by the system?
  • A. 200 J
  • B. 100 J
  • C. 300 J
  • D. 400 J
Q. In a process where 300 J of heat is added to a system and the system does 100 J of work, what is the internal energy change?
  • A. 200 J
  • B. 300 J
  • C. 100 J
  • D. 400 J
Q. In a process where 300 J of heat is added to a system and the system does 100 J of work, what is the change in internal energy?
  • A. 200 J
  • B. 100 J
  • C. 300 J
  • D. 400 J
Q. In a project involving tasks A, B, C, and D, if A and B can be done simultaneously but must be completed before C, and D can be done at any time, which of the following is a correct sequence?
  • A. A, B, C, D
  • B. C, A, B, D
  • C. D, A, B, C
  • D. B, A, C, D
Q. In a project involving tasks A, B, C, and D, if task D can only start after task B is completed, which of the following is a possible order of tasks?
  • A. A, D, B, C
  • B. B, A, C, D
  • C. C, B, A, D
  • D. D, A, B, C
Q. In a project involving tasks A, B, C, and D, if task D can only start after task B is completed, which of the following is a valid conclusion?
  • A. B must be completed before D
  • B. D can start before B
  • C. A can start after D
  • D. C must be completed before B
Q. In a project involving tasks A, B, C, and D, if task D cannot be started until task B is completed, which of the following is a valid implication?
  • A. B must be completed before D.
  • B. D can start before B.
  • C. A can start before B and D.
  • D. C must be completed before D.
Q. In a project involving tasks A, B, C, and D, if task D cannot start until task B is completed, which of the following is a valid inference?
  • A. B must be completed before D.
  • B. D can start before B.
  • C. A can start before B.
  • D. C must be completed before D.
Q. In a project involving tasks A, B, C, and D, if task D is dependent on both A and B, which of the following is a valid completion order?
  • A. B, A, D, C
  • B. A, C, B, D
  • C. C, A, B, D
  • D. A, B, D, C
Q. In a project involving tasks X, Y, Z, and W, if W cannot start until Y is completed, and Z can only start after W, which of the following is a valid sequence?
  • A. Y, W, Z, X
  • B. W, Y, Z, X
  • C. Z, W, Y, X
  • D. X, Y, W, Z
Q. In a project management context, which of the following best describes 'resource leveling'?
  • A. Distributing resources evenly across all tasks.
  • B. Adjusting the start and finish dates of tasks to balance resource usage.
  • C. Allocating more resources to critical tasks only.
  • D. Reducing the overall project scope.
Q. In a project timeline, if Task 1 must be completed before Task 2, and Task 3 can start only after Task 2, which of the following sequences is valid?
  • A. Task 1, Task 3, Task 2
  • B. Task 2, Task 1, Task 3
  • C. Task 1, Task 2, Task 3
  • D. Task 3, Task 1, Task 2
Q. In a project with tasks A, B, C, and D, if task C can only start after both A and B are completed, which of the following is a valid sequence?
  • A. A, B, C, D
  • B. B, A, D, C
  • C. C, A, B, D
  • D. D, C, A, B
Q. In a project with tasks P, Q, R, and S, if P must be completed before Q and R, and S can be done at any time, which of the following is a possible order of completion?
  • A. P, Q, R, S
  • B. R, P, Q, S
  • C. S, P, Q, R
  • D. Q, R, P, S
Q. In a project with tasks P, Q, R, S, and T, if P must be completed before Q and R, and R must be completed before S, which of the following is a valid conclusion?
  • A. S can start before P.
  • B. Q can start after R.
  • C. R can start after P.
  • D. T must be completed before P.
Q. In a project with tasks P, Q, R, S, and T, if P must precede Q and R must follow S, which of the following is a possible order?
  • A. P, Q, S, R, T
  • B. S, R, P, Q, T
  • C. Q, P, S, R, T
  • D. R, S, P, Q, T
Q. In a purely capacitive AC circuit, the current leads the voltage by how many degrees? (2022)
  • A.
  • B. 90°
  • C. 180°
  • D. 270°
Q. In a purely capacitive AC circuit, the current leads the voltage by how much phase angle? (2023)
  • A. 0 degrees
  • B. 90 degrees
  • C. 180 degrees
  • D. 270 degrees